ALLROADS completed works on Stage 1 of Westfield Coomera the development which saw the deployment of 70 trucks and over 40 different pieces of machinery at the Foxwell Road site.
Works included bulk earthworks, detailed excavation, erosion and sediment controls, culvert installation, and stormwater and pavement construction. More specifically some of the project highlights have included:
Over 2km’s in stormwater pipework installed,
Export of 75,000m3 of topsoil material offsite,
Approximately 240,000m3 of earthworks operations,
Supply and install of 55,000 tonnes of capping material,
Sewer connection under bores under Foxwell Road.
Upon the success of Stage 1 works, ALLROADS were engaged to complete Stage 2 – Internal Roadworks. As part of these works, ALLROADS was responsible for the following:
Supply and laying of over 15,000 tonnes of road base material
Laying of over 4 km of concrete kerb and channel
Supply and installation of over 6000m2 of concrete loading docks
Supply and laying of over 30,000 tonnes of asphalt.
Detailed co-ordination between Contractor, Client and Designer to allow for onsite workshopping of design revisions
ALLROADS engaged CPESC designed ESC Control & Implementation
On the fly ESC Plan revisions are able to be designed, implemented and then recorded on site with ease
Working alongside SDC to implement on the fly changes to methodology for the top down basement construction
Third Party Environmental and Acid Sulphate Soil Auditing
Export of over 75,000m3 of topsoil from site with no public complaints.
Previous Next Westfield Design & Construct $5.6 Million Carindale, Queensland Westfield completed...
Read MorePrevious Next Westfield Design & Construct $8.3 Million Upper Mount Gravatt, Queensland...
Read MorePrevious Next PCA (QLD) Pty Ltd T/as Probuild $2.0 million Coorparoo, Qld...
Read More